Construction Timeline: Lampu

Since this blogpost is late, I am going to highlight the actual timeline of this project:

March 27th – March 31st – Test plywood cuts on laser cutter

April 1st – April 3rd – Brainstorm and Re-design

April 17th – 20th – Manufacturing (cut pieces to size, machine the insert and assemble)

April 22nd – April 26th – Finishing touches (sand, stain, assemble lighting fixture)

April 27th – April 28th – Poster Design

April 29th – Design Expo!

 