As of now I have selected and order almost all of my components. They will be delivered by Amazon within 2 days and I estimate fabrication will take approximately 3 hours. I will still need to take a trip to the hardware store to get the necessary right angle pipe fitting that will fit my pump.  I will likely pick up two sizes as I have ordered 2 pumps with different flow rate specification ratings.  I suspect the lower power pump will be sufficient for this application but wanted to be safe unless it is not powerful enough to generate the required rotation.

Previous Post
Final Stretch: Lava Lamp Tap Handle
Next Post
Final Stretch Progress

2 Comments. Leave new

Jaehyung Lee
May 8, 2019 8:50 pm

Hi Chris, I had the same problem with ordering materials. I ended up using amazon, but some of my materials were not under prime so I had to wait for 2 weeks. Lucky you!

Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.

Menu