Construction Timeline 2019
The timeline for this Aesthetics project can be grouped in the following way: April 8-10: Finalize Idea/Aesthetic April 12: Order Materials Needed April 14: Create Simple Prototype April 15 – 18: Begin Construction April 19-21: Finalize Construction
Read More Smart Mirror Construction Timeline
Laser Cutting I will first laser cut the mirror frame out of a large sheet of wood on the laser cutters in the Idea Forge. I will also cut out the back panel that will hold the panel in place. These will be complete by April 10th Mirror frame and back piece Mirror sourcing and cutting I will…
Read More Construction Timeline
For my project I am working on the string art with either a lighting portion or a dynamic string spray portion. I have gathered all of my materials aside from the lighting which I am waiting to be shipped. I have a small plaque with the letter “H” traced on, a hammer, a small set…
Read More Magic Chair Construction Timeline
The timeline for my Super Lounge Musical Chair is a tight one, but day by day, I have honed in on my ideas for what it shall be. I have narrowed down a chair that was donated for free. It has a bit of an arts-and-crafts aesthetic, but it is much rounder than the traditional…
Read More Car Radio Project Timeline
The end of the semester is coming up alarmingly quickly. A work schedule is required to keep this project from slipping into disarray and failure. I spent a decent chunk of time over spring break working on this project. I was working on the electronics portion of the project. Things went slowly, as I have…
Read More Project Timeline
Current Gantt Chart of my project. Grey blocks are already complete. So far I am on schedule with my project. This week was very busy for me with other classes, so next week will be a big work week for me. I plan to build the entire base of my lamp, flesh out the electronics,…
Read More Construction Timeline
I did a couple rough sketches and played around more with the idea over spring break. This past week I began to design my first prototype. I started of by modeling all of the parts in Rhino . After that was complete, I placed them all out on a 2-D surface so they could be…
Read More Construction Timeline: Shi-Shi Odoshi
The construction of my water fountain will be pretty involved. I will need to buy a large acrylic box and cut it to the dimensions of my prototype and drill a hole for the water pump and a slot for the container support. Next, I will need to buy a PVC pipe and cut it…
Read More Project Construction
After much deliberation I have decided to do the projection mapping without the computer vision piece. This will make my construction much more streamlined. I am in the middle of this tutorial: https://ofxpimapper.com/pages/github-instructions/ I also came across two good examples of what I am trying to accomplish. This first is the figure of a stadium…
Read More Construction Timeline 2019
April 7th: Finish collecting required components and materials April 12th : Use wood workshop to critique and edit chair April 15th: Complete chair drawer project
Read More Construction Timeline Kanshou and Bakuya
The timeline for my construction will be to have my outlines and materials gathered by the end of this week. The next week will be spent shaping the two swords via jigsaws, grinders, and dremels. I approximate the actual work taking two hours per sword, with the only difficulty finding time to head into the…
Read More Construction Timeline
Auto Pet Feeder Timeline: April 7: Get the Arduino Code DoneApril 8: Materials Delivered April 12: Wood Workshop and Laser Cutter and will hand it to my artist friendApril 15: Learning and Printing StickersApril 22: Presenting to My Pod
Read More Construction Timeline
My project is building a wall clock with a Mechanical Engineering theme that includes tools such as gears, wrenches and hammer. My initial design include the use of gears that can rotate And tools for the numbers on the clock corresponding to the clock time. For now I have designed tools for the 12, 3,…
Read More Construction Timeline
For my final project, I am creating a hanging/standing planter with a removable shelf. The main purpose is to fit in a variety of spaces. The asthmatic will be modern. Already have: Wood for the shelves April 4th: Order steel for the supports of the shelves April 5-8: Cut the wood to size and cut…
Read More Construction Timeline
I essentially have two weeks to complete my construction of my box, and make sure I have any replacement parts I need if anything breaks/doesn’t work. I have already ordered and received the lock that I should need to install in the box. I currently plan on working on my project at least three days…
Read More Construction Timeline
For my final project, I am creating a tornado desk fountain. April 4th: Order water pump, jar/vessel, and tubing. April 4-8: Figure out wiring and base material April 8 (2 day shipping at best): Plum up vessel and drill hole April 9-18: Test and adjust hole size and flow rate. April 18-21: Prepare my final…
Read More Construction timeline
4/8 MDF cut and assembled. 4/10 MDF filled and primed. 4/15 Electronics completed 4/20 Greebles and painting complete
Read More Construction Timeline
Below is my timeline for my project (making candles) Week 4/7: Finding an appropriate wax mold and buying it. Week 4/14: buying candle materials Week 4/21: making candles with different smells and trying them Week 4/28: Minor cleanup if necessary
Read More Construction Timeline: Kinetic Motion
For my final project, I am creating a kinetic motion machine that serves no functional purpose. I have chosen only to create something based on a visual aesthetic. Already have: Wood for the base, nail gun for fastening, and wood stain. April 4th: Order blue and white acrylic, spacers, and hex bolt. April 4-8: Plane…
Read More Construction Timeline
In my design review I had cut out the sewing pattern fabric for the 1/2 size coat: Front panels for 1/2 size coat. Back panels for 1/2 size coat. Sleeves for 1/2 size coat. Collar insert for 1/2 size coat. Since then, I sewed those pieces together to make a full 1/2 sized coat. Here…
Read More Construction Timeline: Floating Faucet
As of now, I managed to outsource most of the materials that I need for my project. I started testing the fountain with the materials that I have, and the results were great. However, I still haven’t chosen a base or container for my fountain as I want to match the design of the base…
Read More Construction Timeline
For the final project I am going to build a coat rack with a Dougong outlook. I already create the 3D model for the Dougong. I already have the rack part. So the next step is to print the top part out in ITLL. The 3D print works as a prototype for the whole design.…
Read More Construction Timeline: Light Sculpture
I have begun building my final project. I knew the machine shop was going to be busy after spring break so I decided to get all my turning done before it was crowded this Monday as seen with the pictures below. I ordered the materials right after our initial design review. I have also had…
Read More Construction Timeline
Week 3/28: Begin designing the casing in Solidworks Week 4/7: Order and assemble the industry Bluetooth speaker Week 4/14: Begin 3D printing prototype and implement the speaker Week 4/21: Continue iterating through prototypes and perfect speaker quality Week 4/28: Minor cleanup if necessary
Read More Construction Timeline: Terrarium
For my final project I am creating a snowglobe terrarium. I already have almost all of my materials and I have made the main base of the terrarium, which was the most time consuming part of the project. I am also only available to work on the project during the weekend due to my busy…
Read More Jae’s Construction Timeline
I made some major change for my project. I realized that there is 12 Volts light bulb so I decided to have separate power sources for the light bulb and the motor. Therefore, I will connect the light bulb to the standard 110V house electrical outlet and the motor to the 12V battery. For the…
Read More Construction Timeline: Fiber-Optic Clock
The schedule for the construction of my fiber optic clock design is fairly straight forward. I already have all the code finished and I have prototyped the circuits. All that is left to do is finish the fiber optic display and the front face of the clock, build the frame, and wire all the components…
Read More New Designs and Construction Timeline
I’ve been working on the design of my climbing rope chair, and I’m getting more and more excited about the idea. I made a more complex grasshopper definition to create a whole chair with a metal frame modeled in it. I still wanted to mess with the shape, but I needed to include the supports that…
Read More Construction Timeline
My construction timeline is pretty straightforward. Due to myself being enrolled in four other classes which each have their own project due in the next four weeks, I am utilizing my time this weekend to finish the bulk of the building. I will maybe try to add some paint if I can find a cheaper,…
Read More Construction Timeline: wall clock
Week 1 (3/24-3/30) Finish Solidworks models and drawings. Visit machine shop for feedback. Week 2 (3/31-4/6) Purchase all materials from Homedepot or Amazon. Start manufacturing process. Week 3 (4/7-4/13) Finish up manufacturing process Product assembly and surface finish Week 4 (4/14-4/20) Whole week reserved for unknown factors that will delay the original plan.
Read More Construction Timeline
For my final project, I am creating a smart mirror out of an old iPad 2. I have most of my materials already including the iPad, wood glue, and wood for the frame. I still need to get the two way mirror that will be in front of the iPad. This is something I think…
Read More Construction Timeline: Dehydrator
Week 1 (Mar 25 – Mar 31): Final Design with dimensions finalized Materials were picked up from home depot Week 2 (Apr 1 – Apr 5): Material will be cut down to size according to dimensionsFitting test to make sure everything will mate correctly Week 3 (Apr 8 – Apr 12): Main aesthetic of project…
Read More Construction Timeline: Iron Punk
4/10 All materials and models gathered and completed. Including electronic components. Ready for final construction of main armor portion Ready for soldering and wiring of lights (This image depicts some of the components and progress that I have made in testing the ability of EVA foam to finalize this armor design. Also included is the…
Read More Construction Timeline
Week 1 (April 1 – April 5) – Order materials (acrylic and pump) Week 2 (April 8 – April 12) – Laser cut acrylic, Glue acrylic, Set up pump Week 3 (April 15 – April 19) – Early in the week, glue rocks onto the sides of the acrylic, set the pump in the rocks,…
Read More Construction Timeline: Tabletop Garden
4/1: SketchingDesign goals: color, form, size, cohesion, significance of objects, edges, environment, emotion, sound, feelMaterial orderingConstruction organizationFinal report draft of goals and aesthetic 4/8 ConstructionIterationPlant implementationFinal report of implementation, functionality, and challengesTroubleshooting 4/15: DUE
Read More Construction Timeline: Magnetic Makeup Organizer
For my final project, I have a constructed a timeline to the best of my ability. This includes what I know I need to get done and factors in some space for unforeseen circumstances that may delay my project construction. April 5: Buy remaining materials (sheet metal, frame, cup, magnets) April 8: Cut down material…
Read More Construction Timeline: Beer Tap Handle
For my tap handle, I have a pretty good handle on all of the steps that I need to take to construct the handle. In each category there is some sub-tasks: “Glass” piece of main body -Finalize model of positive -Print out positive -Coat in epoxy for smoothing -Make silicone mold -Cast in resin Electronics -Finish modeling base to…
Read More Arcade Construction Timeline
So far, I have recently finished the overall design of the arcade outside case. I have also programmed the arduino to play the Galaga theme song at the push of a button. There is still a lot of work to be done to finish this project. Having finished the overall design of the case I…
Read More Construction Timeline: Bauhaus Shelf
I’m making a shelf that will be mounted on the wall and will have a terrarium incorporated into it. The idea is finalized, I just have to make it now which I don’t believe will take much time. I have the main circle part of the shelf already, I just have to get the other…
Read More Construction Timeline
For this project I am still working on the open night stand portion before the electrical portion. I already have a sheet of 5×5′ plywood, LEDS, the leather vinyl, and the wireless phone charger purchased. The last thing that needs to be purchased is the arduino zero and white paint. For the rest of this…
Read More Kinetic Sculpture Timeline
As of this blog post, I’ve acquired all my materials, outlined the general mechanics of my sculpture, and begun the process of construction. First I drilled into a block of wood and glued a wooden pole as my base. I’ve also wrapped the base with a flexible wire, which will hold the two mobiles I…
Read More Construction Timeline: Infinity Mirror Clock
My project is nearly complete at this point. I spent a good chunk of my break on the fabrication, wiring, and programming involved. At this junction, all that remains is the assembly of the clock and I need to droll one more hole into the back panel to feed a power cord through. I plan…
Read More Construction Timeline
Week 3/31: Lasercut wood for Shut-Box Week 4/7: Use fasteners with the finished wood to create box Week 4/14: Place cork mat down on wood surface for soft dice rolling Week 4/21: Feed metal rod through box and place numbered tokens on the rod Week 4/28: Minor cleanup if necessary
Read More This semester’s students
-
Abhishek Raut
-
Abigail Schefer
-
Aidan Shelburne
-
Ali Alfares
-
Alexander Hernacki
-
Alex Jakubek
-
Alex Kelling
-
Alexandr Vassilyev
-
Anil Antony Karathra
-
Ankit Karkhanis
-
Anna Lugthart
-
Aryan Gandhi
-
Austin Beltz
-
Ben Fougere
-
Bodhin Peterson-Smart
-
Roger Carter
-
Cameron Sprenger
-
Brewster Beck von Peccoz
-
Chris Griffin
-
Chin-Hsuan(Andrea) Wang
-
Connor Jameson
-
Colin Neeson
-
Daniel Bojorquez
-
Derek Spatola
-
Dylan Jackson
-
Eileen Reh
-
Elvin Chateauvert
-
Ethan Street
-
George Davis
-
Grant Barnes
-
Grady Forsyth
-
Hannah Matthews
-
Hayden Moll
-
Will Harris
-
Heider Iacometti
-
Holly Young
-
Hunter Maul
-
India Johnson
-
Ivan Werne
James Cadagan
-
Jon Albaum
-
Josh Calugay
-
Jonah Chapel
-
Jose Salgado
-
Lily Gabriel
-
Luke Carey
-
Lucas Fesmire
-
Matt Holleb
-
Maddie O'Brien
-
Michael Dailey
-
Nate Olson
-
Nic Garzione
-
Owen Hull
-
Palmer Dick-Montez
-
Peter Jakubczak
-
Perry Owens
-
Pere Roquet Arroyo
-
Rachel Jones
-
Reed Beidleman
-
Bekah Smith
-
Rishi Assar
-
Riley Dressel
-
Rishabh Rai
-
Sam Vallo
-
Cody Wong
-
Abdulrahman Nashawi
-
Austin Maes
-
Austin Ross
-
Benjamin Chang
-
Benjamin Robles
-
Brooke Shade
-
Charles Keely
-
Christopher Lehr
-
Davis Butte
-
Davis Robertson
-
Daniel Straub
-
Emily Jordan
-
Ethan Elshyeb
-
Fiona Bell
-
George
-
Hailee Pritchard
-
Hannah Walsh
-
Isabella Colosimo
-
Jason Fontillas
-
Jamie Frankel
-
Jackson Hootman
-
Joseph Knapp
-
Justin Engbrecht
-
Justin Lim
-
Kaiya Wahl
-
Kensue Kiatoukaysy
-
Kevin Yang
-
Mary Rahjes
-
Miles Radakovitz
-
Nathaniel Wang
-
Nicole Leon-Molina
-
Noah Verspohl
-
Patrick Bodine-Ellison
-
Paul Tapsall
-
Max Armstrong
-
Rhys Rueffert
-
Ryan Weatherbee
-
Thomas Buckholtz
-
Victoria Rios
-
Will Tse
-
Xiang Luo
-
Zach Aldrich
-
Jean Hertzberg
-
Shrey Naresh Solanki
Subscribe to Blog via Email
Join 31 other subscribers