Project Construction

After much deliberation I have decided to do the projection mapping without the computer vision piece. This will make my construction much more streamlined. I am in the middle of this tutorial: https://ofxpimapper.com/pages/github-instructions/ I also came across two good examples of what I am trying to accomplish. This first is the figure of a stadium…
Read More

Construction Timeline

I essentially have two weeks to complete my construction of my box, and make sure I have any replacement parts I need if anything breaks/doesn’t work. I have already ordered and received the lock that I should need to install in the box. I currently plan on working on my project at least three days…
Read More

Construction Timeline

For my final project, I am creating a tornado desk fountain. April 4th: Order water pump, jar/vessel, and tubing. April 4-8: Figure out wiring and base material April 8 (2 day shipping at best): Plum up vessel and drill hole April 9-18: Test and adjust hole size and flow rate. April 18-21: Prepare my final…
Read More

Construction Timeline

Week 3/28: Begin designing the casing in Solidworks Week 4/7: Order and assemble the industry Bluetooth speaker Week 4/14: Begin 3D printing prototype and implement the speaker Week 4/21: Continue iterating through prototypes and perfect speaker quality Week 4/28: Minor cleanup if necessary
Read More

Construction Timeline

My construction timeline is pretty straightforward. Due to myself being enrolled in four other classes which each have their own project due in the next four weeks, I am utilizing my time this weekend to finish the bulk of the building. I will maybe try to add some paint if I can find a cheaper,…
Read More

Construction Timeline: wall clock

Week 1 (3/24-3/30) Finish Solidworks models and drawings. Visit machine shop for feedback. Week 2 (3/31-4/6) Purchase all materials from Homedepot or Amazon. Start manufacturing process. Week 3 (4/7-4/13) Finish up manufacturing process Product assembly and surface finish Week 4 (4/14-4/20) Whole week reserved for unknown factors that will delay the original plan.  
Read More

Construction Timeline

For this project I am still working on the open night stand portion before the electrical portion. I already have a sheet of 5×5′ plywood, LEDS, the leather vinyl, and the wireless phone charger purchased. The last thing that needs to be purchased is the arduino zero and white paint. For the rest of this…
Read More