Progress – Cargo Kite
2 Comments
Work is proceeding. I have partially redone the CAD to fix the bugginess of the original assembly, redesign the cross-spar joints, and update the design to the smaller size of main spars I was able to source (the kite was originally 180 cm long; now, 150). Further, I have received parts! The fiberglass spars and…